Our sustainable blow-molded mannequin development process typically follows these steps:
a) Design Input
The customer provides a sample, 3D drawing (STP/STL), or design concept.
b) Blow-Molding Assessment & 3D Development
We evaluate the design for blow molding and provide a 3D file for customer approval.
Approx. 7 days
c) Mold Development
Production mold is developed based on the approved design.
Approx. 30 days
d) Pre-Production Sample
A production sample is made for customer approval.
Approx. 3 days
e) Mass Production
Full-scale production begins after sample approval.
Approx. 21 days
Sustainable Mannequin Manufacturer
for Global Retail Brands
No.2,Yinzhu road, Zhouwu industrial zone,Dong cheng District, Dongguan City,Guangdong Province, China.
E-mail:info@pcmannequins.com